Polavaram backwater row: Ponguleti blames BRS; Uttam seeks Chhattisgarh nod for Sammakka Sagar FRL storage
▤Summary
- Backwater is water pushed upstream by a dam; Polavaram's backwater may submerge Telangana land, and Telangana needs Chhattisgarh's consent for the Sammakka Sagar barrage
- Revenue Minister Ponguleti Srinivas Reddy alleged the previous BRS government was responsible for the potential Polavaram backwater threat to Bhadrachalam and other Godavari areas in Telangana; claimed seven mandals of erstwhile composite Khammam and five Gram Panchayats adjoining Bhadrachalam were merged with residual AP after bifurcation due to then-CM negligence
- He reviewed Sita Ramachandra Swamy temple redevelopment in Bhadrachalam and noted no flooding this season partly due to El Niño’s potential impact, while warning of future rise in flood levels
- Barrage at Tupakulagudem (Kannadigudem, Mulugu): 1,143 m long, 59 radial gates, designed storage 6.94 TMC at FRL +83 m, planned diversion 46.96 TMC; aims to stabilise 4.40 lakh acres under SRSP Stage-II
- TG already paid ₹9.88 crore to Chhattisgarh WRD (Bijapur) for backwater studies; DGPS surveys of FRL/high flood levels reported completed in August
🎯Exam Relevance
For UPSC · TGPSC · APPSC aspirants
TGPSC: Polavaram backwater federalism, Sammakka Sagar project specs, inter-state NOC/compensation, SRSP ayacut.
అKey Terms · English–Telugu
Polavaram backwater – పోలవరం వెనుకనీరు — alleged flood threat to Bhadrachalam belt
Sammakka Sagar / Sammakka Sarakka barrage – సమ్మక్క సాగర్ — Godavari project seeking Chhattisgarh cooperation
Full reservoir level / FRL – పూర్తి రిజర్వాయర్ మట్టం — +83 m design level
SRSP Stage-II – ఎస్ఆర్ఎస్పి దశ-II — 4.40 lakh acres stabilisation goal
DGPS survey – డిజిపిఎస్ సర్వే — backwater/FRL mapping for Chhattisgarh