Bhatti asks officials to scale up thermal generation to 140 MU daily as El Nino slumps hydel power

·TelanganaState PoliciesInfrastructureClimate Change★ Must ReadEvolving/Recurring

▤Summary

  • Plant Load Factor (PLF) measures how much a power plant actually generates against its capacity; Telangana's Deputy CM ordered thermal generation raised to 140 MU/day as El Niño slashes hydel output
  • Thermal average rose from 65.9 MU (2024–25) to 90.97 MU this year (~19% up), peaking at 118 MU (Oct 16); all units to run at maximum PLF
  • TG Clean and Green Energy Policy 2025: pre-bid for 7,800 MW RE, incl. 2,000 MW FDRE (round-the-clock RE + storage) and 3,000 MW solar (~190 bidders)
  • Challenges: low reservoir inflows (Srisailam, Nagarjuna Sagar), coal stocks, higher emissions and costs
  • Way forward: storage-backed FDRE, demand-side management, regional power trading

🎯Exam Relevance

For UPSC · TGPSC · APPSC aspirants

Prelims: PLF, FDRE, MU. TGPSC / GS3 Mains: hydel–thermal mix under El Niño, energy transition, TG Clean & Green Energy Policy 2025.

అKey Terms · English–Telugu

Plant Load Factor – ప్లాంట్ లోడ్ ఫ్యాక్టర్ (capacity use)
Thermal power – థర్మల్ విద్యుత్ (coal-based power)
Hydel – జల విద్యుత్ (hydroelectric power)